Capital Improvement Projects Resolutions and Proposed Projects
City Council-Approved Capital Improvements Program (CIP) Plans
These are 5 year forecasts approved by the City Council. The projects in the first year are those to be funded, the remainder are a tool to forecast future funding.
Previous 5 Year CIP Plans as approved by Council:
-
- Resolution No. 3977 – Year Capital Improvements Program (CIP) Plan (FY 2022-2026) (02/08/2022).
- Resolution No. 3940 – 5 Year Capital Improvements Program (CIP) Plan (FY 2022-2026) (08/10/2021).
- Resolution No.3852 – FY2020- 2024 Capital Improvements Program (CIP) Plan (9/24/2019)
- Resolution No. 3728 – FY2018-2022 Capital Improvements Program (CIP) Plan (9/19/2017)
- Resolution No. 3630 – FY2016-2020 Capital Improvements Program (CIP) Plan (9/22/2015)
- Resolution No. 3506 – FY2014-2018 Capital Improvements Program (CIP) Plan (9/10/2013)
- Resolution No. 3367 – Change to 2 year cycle (8/23/2011)
Capital Improvements Program (CIP) Projects Submitted for Consideration (Unfunded / Unapproved)
These are projects that have not been funded or approved by Council. These projects are reviewed every two years for inclusion in the 5 Year CIP Plan. If you do not see a project listed below that you feel is important to add, please return to the top of this page and submit the Capital Improvement Project request form with your request.
- Facilities Projects
- Parks Projects
- Sidewalk Program
- Special Projects
- Street Projects
- Storm Water Projects
- Storm Water Master Plan
- Traffic Signal Program
Facilities Projects
- Fire Station 6 (FA_09_001)
- Fire Department Training and Storage Facility (FA_09_005)
- Fire Station 4 (FA_09_006)
- Fire Station 3 Additions (FA_09_010)
- Community Center/Branch Library (FA_09_013)
- Senior Center (FA_09_014)
- Fire Station 7 (RELLIS) (FA_17_001)
Parks Projects
- Aquatics Center Land & Preliminary Design (PK_09_001)
- Parkland Acquisition (PK_09_003)
- Bonham Park Splash Pad (PK_09_005)
- Tanglewood Park Restrooms (PK_10_001)
- Briar Creek Hike and Bike Trail Phase 1 (PK_14_001)
- Briar Creek Hike and Bike Trail Phase 2 (PK_14_002)
- Henderson Park Football Fields (PK_15_001)
- Neal Park Turf Fields & Play Structure Replacement (PK_15_003)
- BRAC – Concession Stand Repair – Turf Install (PK_15_005)
- Castle Heights Park Play Structure Replacement (PK_15_007)
- Sadie Thomas Park Expansion – Adjacent 13 Acres (PK_15_008)
- Scurry Park Splash Pad (PK_15_009)
- Austin’s Colony Park – Turf Replacements (PK_15_010)
- Park Hudson Trails Extension to Veteran’s Park (PK_15_011)
- Tiffany Park – Turf Renovations – Three Areas (PK_15_013)
- Cherry Park – Turf Renovations – Six Areas (PK_15_015)
- Miracle Place Park – Trail Parks Connection (PK_15_016)
- City Pools Repair Project(PK_15_023)
- Park Hudson to Copperfield Trails Connection (PK_15_026)
- BRAC – Develop Rest of Property – 60 Acres (PK_15_027)
- Water Park(PK_15_028)
- Sadie Thomas Park Pedestrian Bridge (PK_23_001)
- Ibarra Park Restrooms (PK_24_002)
Sidewalk Programs
- Villa Maria Sidewalks (SD_09_002)
- East 29th St Shared Use Path (SD_09_005)
- Broadmoor Drive Sidewalks (SD_09_009)
- Rustling Oaks Drive Sidewalks (SD_09_013)
- Sidewalk Construction – Various Locations (SD_10_001)
- East 25th Bike Lanes & Sidewalks (SD_14_004)
- SH 21 Sidewalks (Earl Rudder to Coulter Field) (SD_14_005)
- E. 30th Street Sidewalks (SD_14_006)
- Sandy Point Road Sidewalks (SD_14_007)
- Saunders Street Sidewalks (SD_15_004)
- Villa West Sidewalks (SD_16_001)
- District 4 Sidewalks – Phase 2 (SD_16_002)
- E North Avenue Sidewalks (SD_16_003)
- Tabor Road Sidewalks (SD_16_004)
- District 4 Sidewalks – phase 3 (SD_16_005)
- Oak Grove/Oak Ridge Sidewalks (SD_17_002)
- Esther Blvd Sidewalk & Bike Path (SD_18_001)
- Haswell Park Neighborhood Sidewalks (SD_23_003)
- Hanus Subdivision Area Sidewalks (SD_23_004)
- Woodland-Wayside Drive Sidewalks (SD_23_005)
Special Projects
- Midtown Quiet Zone and RR Crossing Improvements (SD_19_002)
Street Projects
- Lynndale Acres Subdivision Ph 2 (ST_09_002)
- Austin’s Colony Pkwy. Extension (ST_09_004)
- Neighborhood Infrastructure Redevelopment – Area 3 (ST_09_005)
- Neighborhood Revitalization (W 23rd & Logan) (ST_09_006)
- Neighborhood Infrastructure Redevelopment – Area 1 (ST_09_007)
- Lightfoot Lane Extension (ST_09_013)
- North Downtown – Phase 6 (ST_09_015)
- Bryan Avenue, Downtown – Phase 4 (ST_09_017)
- Lynndale Acres Neighborhood Improvements (ST_09_018)
- Freedom Blvd. Reconstruction (ST_09_023)
- Castle Heights Subd. Street Construction (ST_09_025)
- Jones Rd. Widening (ST_09_032)
- Silkwood Dr. Extension (ST_09_033)
- Wildflower Dr. Widening (ST_09_038)
- Sims St. Reconstruction (ST_09_039)
- Sam Rayburn Extension(ST_09_040)
- Oak Hill Overpass (ST_09_045)
- Carson St. Reconstruction (ST_09_046)
- Villa Maria Reconstruction (ST_09_056)
- MLK Street Reconstruction – Phase 1 (ST_09_109)
- 29th St. Reconstruction – Phase 1 (ST_09_136)
- Carter Creek Pkwy – Phase 1 (ST_09_148)
- MLK Street Reconstruction – Phase 2 (ST_09_209)
- 29th St. Reconstruction – Phase 2 (ST_09_236)
- Carter Creek Pkwy. Reconstruction – Phase 1 (ST_09_248)
- 29th St. Reconstruction – Phase 3 (ST_09_336)
- Carter Creek Pkwy. Reconstruction – Phase 3 (ST_09_348)
- E. 32nd (Carter Creek) Phase 4 (ST_09_448)
- Close Loop East – Phase 1 (ST_10_005)
- Close Loop East – Phase 2 (ST_10_006)
- Briarcrest Dr. (FM 1179) Widening (ST_10_007)
- East 29th St. and Villa Maria Rd. Medians (ST_14_001)
- Old College Rd Reconstruction(ST_14_002)
- Close Loop (Super Arterial) (ST_14_004)
- East 29th St. Widening & Bike Lanes (ST_14_010)
- Castle Heights Streets and Sidewalks (Castle & Clark) (ST_16_001)
- Tee Drive Curb and Gutters (ST_16_003)
- Sandy Point Rd Widening (ST_16_004)
- FM 158 (WJB)- Texas to Sims Improvements(ST_17_005)
- FM 158 (WJB) – Sims to SH 21 Improvements (ST_17_006)
- Castle Heights Streets and Sidewalks (Lincoln) (ST_17_007)
- Thornberry Drive Extension (ST_17_008)
- Freeman Ave Reconstruction (ST_18_002)
- Ursuline Ave Reconstruction (ST_18_004)
- Meadow Lane Reconstruction (ST_18_005)
- Oak Grove Revitalization Ph 1 (ST_18_006)
- Oak Grove Revitalization Ph 2 (ST_18_007)
- Oak Grove Revitalization Ph 3 (ST_18_008)
- Oak Grove Revitalization Ph 4 (ST_18_009)
- Graham Drive Reconstruction (ST_20_003)
- North Oakwood Neighborhood Rehabilitation Ph 1 & Drainage Analysis (ST_21_001)
- North Oakwood Neighborhood Rehabilitation Ph 2 (ST_21_002)
- North Oakwood Neighborhood Rehabilitation Ph 3 (ST_21_003)
- Churchill Drive Reconstruction (ST_21_005)
- West 24th Street Rehabilitation (ST_21_006)
- West 23rd Street Rehabilitation (ST_21_007)
- Commerce Street Reconstruction Ph 2 (ST_23_001)
- Mumford Road Ph 2 (ST_23_003)
- Parallel Collector to SH 47 Ph 1 (ST_23_004)
- Parallel Collector to SH 47 Ph 2 (ST_23_005)
- University Drive Extension Ph 2 (ST_23_007)
- Holick Lane Widening (ST_23_008)
- Autumn Lake Drive Extension (ST_24_001)
- E 23rd Street Reconstruction (ST_24_002)
Storm Water Projects
- Wilderness Circle Drainage Improvements (SW_09_009)
- West Fork Still Creek Phase 3 (SW_09_020)
- Burton Creek concrete Lined Channel Repair (SW_09_042)
- Upper Burton Creek Storm Sewer (SW_09_046)
- West Burton Creek Watershed(SW_09_048)
- The Oaks Subdivision Drainage Improvements Phase 1 (SW_09_049)
- Upper Burton Creek Watershed(SW_09_052)
- Cavitt Street Storm Sewer (SW_09_053)
- Castle Heights Drainage Improvements (SW_09_054)
- Still Creek Regional Detention & Culverts (SW_16_001)
- Silkwood Drive Rear Lot Drainage Channel (SW_24_001)
- North Tabor Avenue Storm Sewer (SW_24_002)
- Burton Creek Bank Stabilization – North of Midtown Park (SW_24_003)
Traffic Signal Program
- Texas Ave at MLK Traffic Signal Improvement (TS_09_010)
- Texas Ave at 23rd St. Traffic Signal Improvement (TS_09_011)
- Texas Ave at 26th St. Traffic Signal Improvement (TS_09_013)
- Texas Ave at Carson St. Traffic Signal Improvement (TS_09_016)
- Texas Ave at Sulphur Springs Rd. Traffic Signal Improvement (TS_09_021)
- Texas Ave at Broadmoor/North St. Traffic Signal Improvement (TS_09_022)
- Texas Ave at Rosemary St. Traffic Signal Improvement (TS_09_023)
- Villa Maria at William Joel Bryan Traffic Signal Improvement (TS_09_024)
- Villa Maria at Harvey Mitchell Pkwy. Traffic Signal Improvement (TS_09_032)
- 29th St. at Coulter St. Traffic Signal Improvement (TS_09_034)
- 29th St. at Briar Oaks/Stillmeadow Traffic Signal Improvement (TS_09_040)
- Traffic Signal at S. College @ Old College/Pleasant (TS_09_052)
- Traffic Signal at Harvey Mitchell @ Hwy 21 (TS_09_060)
- Freedom Blvd. Traffic Signal (TS_10_002)
- Traffic Signal (Autumn Lake & Villa Maria) (TS_14_001)
- Traffic Signal (E. 29th & Hollowhill Dr.) (TS_14_002)
- Traffic Signal (Villa Maria Rd. & Red River Dr.) (TS_14_003)
- Two – Traffic Signals at N Coulter Dr at E WJB Pkwy (Westbound & Eastbound) (TS_15_001)